anything for a smile
Delivered and connected in the desired spot
Do you live in an apartment building and don't have an elevator? We deliver up to the 4th floor. We'll build in the product and connect it for you.
Take old product with us
We'll take your old product with us for free, from the spot you used it in.
When you purchase the Whirlpool C WD 96M WBS BE between October 26, 2026 and December 6, 2026, you will receive up to € 100 cashback from Whirlpool. You can register your promotional product for the Bosch promotion until December 20, 2026. View the promotional Terms and Conditions (PDF) for more information.
Product number | 970315 | |
|---|---|---|
Manufacturer code | 7188282370 | |
Brand | Whirlpool | |
Warranty | 2 years | |
Processing of your defect | At your home |
Type of dryer | Heat pump dryer | |
|---|---|---|
Condensation drain | Collection in reservoir, Via drain | |
Maximum load capacity, drying | 9 kg | |
Maximum noise level | 60 dB | |
Cycle duration cotton full load | 270 min | |
Cycle duration, cotton, partial load | 160 min | |
Speed class | Normal | |
Number of programs | 15 | |
Dryer cycles | Bedding, Blankets, Cotton, Cupboard dry, Delicate, Dress shirts, Eco, Extra dry, Iron dry, Jeans, Lingerie, Mixed, Refresh, Short, Small load, Sportswear, Synthetic, Towels, Wool | |
Clean lint trap indicator | ||
Empty condenser reservoir indicator | ||
Optional condensation water drainage | ||
Condensation drain hose included | ||
Laundry-care drum | ||
Drum lighting | ||
Drum rotation direction | Variable | |
Steam function | ||
Humidity sensor |
User-friendliness | Anti-wrinkle phase, Auto shut-off, Child safety lock, Controls via app, Drum lighting, Humidity sensor, Laundry-care drum, Start delay, Steam function, Time remaining indicator | |
|---|---|---|
Touchscreen | ||
Display | ||
Control panel language | Dutch, French | |
Start delay | ||
End of cycle signal | ||
End of cycle signal type | Acoustic, Optical | |
Accessibility options | Audio signals | |
Time remaining indicator | ||
Anti-wrinkle phase | ||
Maximum crease guard time | 30 min | |
Child safety lock | ||
Fragrance system | ||
Brand-specific functions | Whirlpool 6th SENSE |
Energy label | A | |
|---|---|---|
Auto shut-off | ||
Energy-saving over lifespan | 340 euros | |
Energy consumption cotton cupboard dry | 0,79 kWh | |
Annual energy consumption | 79 kWh | |
Annual energy costs | 23,7 euros |
Build quality | Basic | |
|---|---|---|
Condensation efficiency | 6 % | |
Drum material | Stainless steel | |
Self-cleaning condenser | ||
Anti-vibration walls | ||
Casing material | Metal | |
Brushless motor | ||
Cleaning indicators | Condenser, Lint trap | |
Material hinge | High-quality plastic |
Height | 84,6 cm | |
|---|---|---|
Width | 59,8 cm | |
Depth | 67,4 cm | |
Weight | 48,5 kg | |
Opening diameter | 32 cm | |
Glass door | ||
Standard door direction | Right | |
Reversible door | ||
Color | White |
Power supply type | Power grid | |
|---|---|---|
Cable length | 1,5 m | |
Minimum power supply | 800 W |
Controls via app | ||
|---|---|---|
Controlled via Android app | ||
Controlled via Apple app | ||
Controlled via Windows app | ||
Compatible with smartphone / apps | ||
Suitable for Free Drying | Yes |
Receive more coverage in case of damage than with your standard warranty. Coolblue takes care of everything: from taking out the insurance to repairs. Is a repair not possible? You receive the purchase price as CoolblueCredit.
XCover is allowed to arrange and process insurances on behalf of the insurer. The insurances are governed by Belgium law. If you have a complaint, you can contact the or our customer service.
First, add your dryer to your shopping cart. On the next page, choose the Protection Plan below. You always have a 30-day return window and pay no deductible in case of damage.
The insurance can be canceled every year, even if you have paid in advance. If you cancel earlier, you will receive a refund for the overpaid amount.
A really nice, quiet machine. Bed linen doesn't come out crumpled and tangled.
Esmeralda
22 February 2026
Automatically translated from Nederlands
Does what it is supposed to do.
Michiel
28 April 2026
Automatically translated from Nederlands
Very satisfied with it, quiet and good device!
Annelies
3 June 2026
Automatically translated from Nederlands
Type of dryer | Heat pump dryer | |
|---|---|---|
Maximum load capacity, drying | 9 kg | |
Energy label | A | |
Energy-saving over lifespan | 340 euros | |
Maximum noise level | 60 dB | |
Self-cleaning condenser | ||
Depth | 67,4 cm |
According to our dryer expert
You can also control your dryer remotely via your smartphone with the HomeWhiz app.
With a 9kg load capacity, you can dry a large load of bedding at once.
You can save up to € 340 on your energy costs over the lifespan, thanks to the A energy label.
With a maximum drying time of 270 minutes, you dry less quickly than an average heat pump dryer with this load capacity.
The included drain hose is relatively short at 1.2m, so buy a longer hose if this one doesn't reach the drain.
699,-
699,-
Current product
9 kg
8 kg
A
B
340 euros
280 euros
699,-
694,-
Delivered on Monday
Delivered on Monday