anything for a smile
Delivered and connected in the desired spot
Do you live in an apartment building and don't have an elevator? We deliver up to the 4th floor. We'll build in the product and connect it for you.
Take old product with us
We'll take your old product with us for free, from the spot you used it in.
Product number | 985520 | |
|---|---|---|
Manufacturer code | 859993358760 | |
Brand | Whirlpool | |
Warranty | 2 years | |
Processing of your defect | At your home |
Type of dryer | Heat pump dryer | |
|---|---|---|
Condensation drain | Collection in reservoir, Via drain | |
Maximum load capacity, drying | 10 kg | |
Maximum noise level | 63 dB | |
Cycle duration cotton full load | 310 min | |
Cycle duration, cotton, partial load | 175 min | |
Speed class | Normal | |
Number of programs | 15 | |
Dryer cycles | Baby clothes, Bedding, Blankets, Cotton, Cupboard dry, Dress shirts, Eco, Extra dry, Iron dry, Jeans, Lingerie, Mixed, Refresh, Short, Small load, Sportswear, Synthetic, Towels, Wool | |
Clean lint trap indicator | ||
Empty condenser reservoir indicator | ||
Optional condensation water drainage | ||
Condensation drain hose included | ||
Laundry-care drum | ||
Drum lighting | ||
Drum rotation direction | Variable | |
Steam function | ||
Humidity sensor |
Touchscreen | ||
|---|---|---|
Display | ||
Control panel language | Dutch, French | |
Start delay | ||
End of cycle signal | ||
End of cycle signal type | Acoustic, Optical | |
Accessibility options | Audio signals, Clickable dial | |
Time remaining indicator | ||
Anti-wrinkle phase | ||
Maximum crease guard time | 120 min | |
Child safety lock | ||
Fragrance system | ||
Brand-specific functions | Whirlpool 6th SENSE, Whirlpool AdaptiveDry, Whirlpool PrecisionDry, Whirlpool SilentSpin |
Energy label | A | |
|---|---|---|
Auto shut-off | ||
Energy-saving over lifespan | 340 euros | |
Energy consumption cotton cupboard dry | 0,84 kWh | |
Annual energy consumption | 84 kWh | |
Annual energy costs | 25,2 euros |
Build quality | Basic | |
|---|---|---|
Condensation efficiency | 12 % | |
Drum material | Stainless steel | |
Self-cleaning condenser | ||
Anti-vibration walls | ||
Casing material | Metal | |
Brushless motor | ||
Cleaning indicators | Condenser, Lint trap | |
Material hinge | High-quality plastic |
Height | 84,6 cm | |
|---|---|---|
Width | 59,8 cm | |
Depth | 67,4 cm | |
Weight | 47 kg | |
Opening diameter | 32 cm | |
Glass door | ||
Standard door direction | Right | |
Reversible door | ||
Color | White |
Power supply type | Power grid | |
|---|---|---|
Cable length | 1,5 m | |
Minimum power supply | 600 W |
Controls via app | ||
|---|---|---|
Controlled via Android app | ||
Controlled via Apple app | ||
Controlled via Windows app | ||
Compatible with smartphone / apps | ||
Smart home platform | Amazon Alexa, Apple HomeKit |
Receive more coverage in case of damage than with your standard warranty. Coolblue takes care of everything: from taking out the insurance to repairs. Is a repair not possible? You receive the purchase price as CoolblueCredit.
XCover is allowed to arrange and process insurances on behalf of the insurer. The insurances are governed by Belgium law. If you have a complaint, you can contact the or our customer service.
First, add your dryer to your shopping cart. On the next page, choose the Protection Plan below. You always have a 30-day return window and pay no deductible in case of damage.
The insurance can be canceled every year, even if you have paid in advance. If you cancel earlier, you will receive a refund for the overpaid amount.
I would definitely never buy this tumble dryer. It shouldn't be called a dryer. Everything remained wet or damp. From regular laundry to bedding. Fortunately, I was able to exchange it.
Martijn
24 October 2026
Automatically translated from Nederlands
849,-
Type of dryer | Heat pump dryer | |
|---|---|---|
Maximum load capacity, drying | 10 kg | |
Energy label | A | |
Energy-saving over lifespan | 340 euros | |
Maximum noise level | 63 dB | |
Self-cleaning condenser | ||
Depth | 67,4 cm |
According to our dryer expert
With a 10kg load capacity, you can even dry an entire comforter in one go.
You can control your dryer anytime and anywhere with an app on your phone.
With the A energy label, you’ll save an average of € 340 on energy costs over 10 years compared to the E energy label.
Without a self-cleaning condenser, you need to clean the condenser yourself.
You won’t reduce wrinkles or freshen up musty laundry without a steam function.
849,-
849,-
699,-
Delivered on Monday
Delivered on Monday